TechnicalFault Injection: Proving Diagnostic Coverage Instead of Claiming It
300 injected faults, 300 detected, and the voltage supervisor still covers only about 80 % of the failure rate it was credited with. The 99 % in an FMEDA row usually comes from a handbook table. Fault injection tests the mechanism as built, and the result only means something when each failure mode is weighted by its share of the failure rate. New article, with a core supply supervisor and its deglitch filter as the worked example.

